Free every Monday, no card

Get the free Monday listFree listno card

How to write a cleaning method statement that scores well

Guide for cleaning firms of about 5–50 staff Facts checked 10 October 2026 6 min read

On this page
  1. What a method statement is for
  2. Start with the scoring guidance
  3. Turn the specification into a checklist
  4. Explain exactly how the work gets done
  5. Show how you check the quality
  6. Cover health, safety and COSHH
  7. Plan mobilisation and TUPE
  8. Make social value answers specific
  9. Write for the person scoring it
  10. Frequently asked questions

In a public cleaning tender, the method statement is your chance to show how you will actually do the work. It is also where a small firm can show what it does well, because it is scored on what you will do and how convincingly you show it. This guide explains how to plan and write one, step by step, for firms with 5–50 staff. Nothing here guarantees a score, but each step makes your answer easier to mark.

A method statement is one of several scored answers: see how to write quality answers, and for buyers that score mobilisation, our 90-day mobilisation plan.

What a method statement is for

Under the Procurement Act 2023, a contract is awarded to the "most advantageous tender": the one that meets the buyer's requirements and best satisfies the award criteria (Procurement Act 2023, section 19). Award criteria must relate to the subject matter of the contract and be sufficiently clear, measurable and specific. The buyer must describe how tenders will be assessed against them and how much each one counts (section 23).

Your method statement answers the quality questions behind those criteria. The evaluator reads it alongside the specification and the scoring guidance and gives it a mark. Your job is to make that mark easy to award.

Start with the scoring guidance

Before writing anything, find these in the tender documents:

  • the questions, word for word, including any sub-questions;
  • the weighting of each question, so you spend most time where most marks are;
  • the scoring scale and what each score means;
  • the limits: words, pages, font, file type and whether attachments count.

Treat the instructions as rules. A buyer may disregard a tender that breaches a procedural requirement set out in the tender notice or associated tender documents (section 19(3)(d)). If anything is unclear, ask a clarification question through the portal before the clarification deadline.

Turn the specification into a checklist

Go through the specification line by line and list every requirement: sites, areas, tasks, frequencies, hours, standards and reporting. Then mark where your answer meets each one. This checklist stops you missing a requirement buried in an appendix, and it becomes the skeleton of your answer.

Some buyers specify a published standard. For NHS cleaning, for example, the National Standards of Healthcare Cleanliness 2025 cover functional risk categories, cleaning frequencies, technical audits, star ratings and a commitment to cleanliness charter (NHS England). If a standard is named, show you know how it works in practice.

Explain exactly how the work gets done

Replace general statements such as "we will provide a high-quality service" with specifics the evaluator can check against the specification:

  • Staffing: how many cleaners and supervisors, on which days and hours, at which site, and how you cover holidays and sickness.
  • Methods by area: offices, washrooms, kitchens, entrances, classrooms or clinical areas, each with its own tasks, frequencies, products and colour-coding.
  • Periodic work: deep cleans, carpet cleaning, high-level dusting and windows, with when and how they are scheduled.
  • Equipment and products: what you will use, how it is maintained and how you will reduce chemical use or waste.
  • Access and security: keys, alarms, ID badges, signing in and lone working.
  • Communication: who the buyer's day-to-day contact is, how quickly you respond, and how you report.

Use numbers wherever you can: hours, frequencies, response times, audit dates. They give the evaluator something concrete to mark.

Show how you check the quality

Show how you will find and fix problems before the client does. Describe:

  • inspections and audits: who does them, how often, what they check and how results are recorded;
  • putting things right: how a failed item is re-cleaned, how quickly, and how you stop it happening again;
  • complaints: how they are logged, acknowledged and closed;
  • reporting: what you send the buyer each month and what you will discuss at contract meetings.

For contracts worth more than £5 million, the buyer must normally set at least three key performance indicators (section 52). On any contract, show how you will measure and report against the indicators in the specification.

Cover health, safety and COSHH

Show that safe working is built into the job, not bolted on:

  • your health and safety policy, which must be written down if you have five or more employees (HSE);
  • risk assessments for each site, with significant findings recorded if you employ five or more people (Management of Health and Safety at Work Regulations 1999, regulation 3);
  • COSHH assessments for cleaning chemicals, preventing exposure where you can and otherwise controlling it adequately (HSE);
  • induction and training for new and transferring staff, including safe use of products and equipment;
  • how accidents, near misses and hazards are reported and followed up.

Tie this part to the buyer's sites: name the risks in the actual buildings rather than copying a generic statement from your handbook.

Plan mobilisation and TUPE

If the tender asks how you will get from contract award to a smooth first day, set out a dated plan:

  • Before the start: for above-threshold contracts, the buyer must normally wait at least eight working days, starting on the day the contract award notice is published, before signing (section 51). Use that time to confirm site details, order equipment and arrange uniforms and ID.
  • Staff transfer: if TUPE applies, the outgoing employer must give you employee liability information at least 28 days before the transfer (TUPE regulation 11). Explain how you will meet transferring staff and inform and consult their representatives, or the staff directly where the rules allow (GOV.UK).
  • Handover: site walk-rounds with the client, keys and access, inductions, and a check of standards in the first weeks.
  • Contingency: what you will do if staff or equipment are not ready on day one.

Make social value answers specific

If the tender scores social value, answer it with commitments you can deliver, measure and report. Local recruitment, training places or fair working conditions are examples. Tie them to this contract, since award criteria must relate to the subject matter of the contract (section 23). Promise only what you can evidence and deliver.

Write for the person scoring it

  • Mirror the question. Use the buyer's own headings and order, so each part is easy to find.
  • Lead with the answer. Put what you will do first, and the explanation second.
  • Use plain English. Short sentences, no jargon, and spell out abbreviations.
  • Back up claims. Say how you do something now, not only that you will.
  • Stay consistent. Hours in your method statement must match the hours in your price.
  • Score yourself. Ask someone outside the bid to mark your draft against the scoring guidance, then fix the gaps.
  • Check before you submit. Word counts, file names, required formats and that every sub-question is answered.

Frequently asked questions

How long should a cleaning method statement be?

As long as the buyer allows and no longer. Stick to the stated word or page limits, because a buyer may disregard a tender that breaches a procedural requirement (section 19(3)(d)).

Can I reuse method statements from earlier bids?

Use them as a starting point, then rewrite for the buyer's questions, sites and specification. Check that every reference to sites, hours and requirements matches this tender.

Should I attach policies and certificates?

Only if the tender asks for them or allows attachments. Otherwise, summarise what matters inside your answer and follow the instructions on attachments.

Will I find out how my answer scored?

For above-threshold contracts, the buyer must give each supplier whose tender was assessed a summary of the assessment of its own tender and, if different, the winning one (section 50). For smaller contracts, ask the buyer for feedback.

See this week's cleaning tenders in your region before you write your next method statement: Clean Tenders rates every open one for firms of 5–50 staff. Get the free weekly list. Looking at one? Ask for a free bid check.

Browse tenders by region

Researched and written with AI assistance.

Free bid check

Not sure whether to bid? We check the tender against your firm.

Tell us which tender and four facts about your firm: staff, turnover, accreditations and anything we should know. Within two working days we email you a one-page answer: bid, borderline or don’t bid, with the reasons.

Request a free bid check

Free. No card, no account. A one-page answer by email within two working days.

If you bid: the Tender Response Draft, £395 per tender. Your first pack: pay after you have read it.

Free weekly

Get the open cleaning tenders in your region every Monday, free.

Every Monday: up to three open public cleaning tenders in your region that are rated best for a small firm, with the deadline and the link to the official notice. One short email, no charge.